Labor cost for set-up is $500/hour.If the plant plans on level material use and operates 50 days per year,determine the time it takes to setup. Labor cost for set-up is $500/hour.If the plant plans on level material use and operates 50 days per year,determine the time it takes to setup.

Correct Answer

verifed

verified

S = Q^2 ∗ H ∗ (1 - d/p)/(2D)= ...

View Answer

What does TPS stand for?


A) Total Production Streamlining
B) Toyota Production System
C) Taguchi's Production S's
D) Total Process Simplification
E) Toronto Power System

F) A) and E)
G) B) and E)

Correct Answer

verifed

verified

Describe level schedules.What purpose do they serve?

Correct Answer

verifed

verified

Level schedules act on frequen...

View Answer

When suppliers are encouraged to locate near manufacturing plants,the goal of the JIT partnership is to reduce ________ inventory.

Correct Answer

verifed

verified

A scheduler may find that freezing the portion of the schedule closest to the due dates allows the production system to function and the schedule to be met.

A) True
B) False

Correct Answer

verifed

verified

True

What does TPS stand for?

Correct Answer

verifed

verified

Toyota Pro...

View Answer

Differentiate between a push and a pull system.

Correct Answer

verifed

verified

A push system pushes material into downs...

View Answer

Which of the following is not a concern of suppliers as they prepare to enter into JIT partnerships?


A) Suppliers feel that they would be less at risk if they contracted with more than one customer.
B) Suppliers are concerned that customers will present frequent engineering changes with inadequate lead time to deal with them.
C) Suppliers feel that their processes are suited for larger lot sizes than the customer wants.
D) Suppliers are concerned that frequent delivery of small quantities is economically prohibitive.
E) All of the above represent JIT supplier concerns.

F) A) and E)
G) B) and E)

Correct Answer

verifed

verified

Which of the following is generally found in most JIT environments?


A) a push or pull system,depending upon the rate of demand
B) a push system for high margin items and a pull system for low margin items
C) a push system for purchased parts and a pull system for manufactured parts
D) push systems
E) pull systems

F) None of the above
G) D) and E)

Correct Answer

verifed

verified

TPS stands for ________.

Correct Answer

verifed

verified

Toyota Production System

What are the five reasons given by suppliers for their reluctance to enter into JIT systems? Elaborate on one of these,of your choosing.

Correct Answer

verifed

verified

The five reasons are desire fo...

View Answer

Kanban is associated with all of the following except


A) small lot sizes.
B) signals,such as cards,lights,or flags.
C) moving inventory only as needed.
D) increased material handling.
E) reductions in inventory.

F) A) and D)
G) B) and C)

Correct Answer

verifed

verified

Lead time for cakes is 2 days with daily demand of 10 cakes and a safety stock of Lead time for cakes is 2 days with daily demand of 10 cakes and a safety stock of   a day.Each container (kanban) holds 1 cake.What is the correct number of kanbans? A) not enough information B) 1 C) 5 D) 10 E) 25 a day.Each container (kanban) holds 1 cake.What is the correct number of kanbans?


A) not enough information
B) 1
C) 5
D) 10
E) 25

F) A) and D)
G) A) and E)

Correct Answer

verifed

verified

Lead time for computers is 5 days with daily demand of 25 and safety stock of 5 computers.If management wants to use 10 kanbans how many computers should each one hold?


A) not enough information
B) 1
C) 5
D) 10
E) 13

F) D) and E)
G) A) and B)

Correct Answer

verifed

verified

A kanban system requires little variability in lead time because shortages have their impact on the entire productive system.

A) True
B) False

Correct Answer

verifed

verified

The first step in reducing setup times is the separation of setup into preparation activities and actual setup,so that as much work as possible can be done while the machine or process is operating.

A) True
B) False

Correct Answer

verifed

verified

Which one of the following is an example of JIT being used for competitive advantage?


A) Jones Company has decreased the number of job classifications to just a few.
B) Lafourche Metals increases the number of its suppliers to be less dependent on just a few.
C) Houma Fabricators is proud to announce that incoming goods are inspected.
D) Acme Company tells its maintenance department to intervene only if a machine breaks down.
E) Caro Specialty Metals,Inc.has built a new,huge warehouse to store inventory.

F) B) and E)
G) A) and E)

Correct Answer

verifed

verified

A

Level scheduling means producing at a constant rate,regardless of customer demands.

A) True
B) False

Correct Answer

verifed

verified

Lower average inventory is feasible only if setup times are short.

A) True
B) False

Correct Answer

verifed

verified

Lead time for computers is 7 days with daily demand of 5 computers and a safety stock of 1 day.Each kanban holds 8 computers.What is the correct number of kanbans?


A) not enough information
B) 1
C) 5
D) 7
E) 8